China Powder Intelligent Transfer Project: 300 TPH Fixed Screw Ship Unloader from Reliable Suppliers & Factory
01
Project Introduction
The project is located on the bank of the Taidong River in Taizhou City, Jiangsu Province. It comprises four storage silos, each with a diameter of 25 meters and a single-unit storage capacity of 10,000 tons of cement, resulting in a total storage capacity of 40,000 tons. The facility is equipped with a fixed high-efficiency screw-type ship unloader with a throughput capacity of 300 tph as well as a jib-type environmentally friendly powder ship loader with the same hourly capacity. Used in conjunction with the unloader, this system enables online transshipment, expands sales reach, and enhances product competitiveness. The project focuses on integrated handling operations for cement, fly ash, and mineral powder.
02
Equipment Introduction
The ship unloader features environmental protection, high efficiency, intelligence, and cost-effectiveness. In the transfer process, it utilizes advanced workflows, intelligent fixed-volume filling, and integrated smart card management across the entire operation line.
Frequently Asked Questions
What is the total storage capacity of the Taizhou project?
The facility features four storage silos with a combined capacity of 40,000 tons (10,000 tons per unit).
What materials are handled at this facility?
The project is designed for the integrated handling of cement, fly ash, and mineral powder.
What is the processing capacity of the ship unloader?
The fixed high-efficiency screw-type ship unloader has a throughput capacity of 300 tons per hour (tph).
How does the system ensure environmental protection?
The facility utilizes a jib-type environmentally friendly powder ship loader and advanced, dust-controlled workflows for sustainable operations.
What intelligent management features are implemented?
The operation includes intelligent fixed-volume filling and an integrated smart card management system for the entire production line.
Where is this project located?
The project is situated on the bank of the Taidong River in Taizhou City, Jiangsu Province.
01
Intelligence
02
High Efficiency
03
Revolution
04
Environmental

