China Suppliers and Factory for Vehicle-Mounted Screw Ship Unloader at Zhuhai Gaolan Port - 150-500 TPH Capacity
Project Introduction
This project is equipped with a 150 tph fly ash vehicle-mounted screw ship unloading system. This system unloads fly ash from a bulk carrier using a screw ship unloader, connects it with a mobile bulk loading platform through a discharge screw, and then directly loads it onto the ship. All work involved in the entire process, including design, manufacturing, supply, transportation, installation, commissioning, performance testing, etc.
Equipment Introduction
The basic process flow of the vehicle-mounted screw ship unloading system is as follows (including but not limited to): After the bulk carrier berths at the terminal, the vehicle-mounted screw ship unloader enters the operating area, and the discharge spout of the unloader is connected to the mobile bulk loading platform. After the docking is completed, the unloading machine starts operating and loads the bulk truck. The mobile bulk loading platform is equipped with two loading channels. When any one of the bulk loading machines is full and alarms, it automatically switches to the other bulk loading machine for operation.
Frequently Asked Questions
What is the capacity of the vehicle-mounted screw ship unloading system?
The system is designed with a high-efficiency capacity of 150 tph (tons per hour) specifically optimized for handling fly ash.
How does the fly ash transfer from the ship to the loading platform?
The fly ash is extracted from the bulk carrier using a screw ship unloader, which then transfers the material to a mobile bulk loading platform via a dedicated discharge screw.
What is the standard operating workflow once a ship berths?
Once the carrier berths, the vehicle-mounted unloader enters the dock area. The discharge spout connects to the mobile bulk loading platform, and the system begins unloading and transferring the material directly to bulk trucks.
How does the system prevent interruption during truck loading?
The mobile bulk loading platform features two independent loading channels. When one loading machine is full and triggers an alarm, the system automatically switches to the alternative channel to maintain continuous workflow.
What scope of work was covered in this project?
The project provided a comprehensive, turn-key solution covering design, manufacturing, equipment supply, transportation, onsite installation, commissioning, and final performance testing.
Intelligence
High Efficiency
Revolution
Environmental