China Suppliers Factory Vehicle-Mounted Screw Ship Unloader for Fly Ash at Zhuhai Gaolan Port - 150-500 TPH
Project Introduction
This project is equipped with a 150 tph fly ash vehicle-mounted screw ship unloading system. This system unloads fly ash from a bulk carrier using a screw ship unloader, connects it with a mobile bulk loading platform through a discharge screw, and then directly loads it onto the ship. All work involved in the entire process, including design, manufacturing, supply, transportation, installation, commissioning, performance testing, etc.
Equipment Introduction
The basic process flow of the vehicle-mounted screw ship unloading system is as follows (including but not limited to): After the bulk carrier berths at the terminal, the vehicle-mounted screw ship unloader enters the operating area, and the discharge spout of the unloader is connected to the mobile bulk loading platform. After the docking is completed, the unloading machine starts operating and loads the bulk truck.
The mobile bulk loading platform is equipped with two loading channels for continuous operation.
Automatic switching system: When any one bulk loading machine is full and alarms, it automatically switches to the other.
Frequently Asked Questions
1. What is the unloading capacity of this system?
The system is designed to handle a capacity of 150 tons per hour (tph) for fly ash unloading.
2. What materials is the vehicle-mounted screw unloader suitable for?
This specific system is optimized for fly ash, but screw unloaders are generally suitable for various dry bulk materials.
3. How does the system handle bulk truck loading?
The unloader connects to a mobile bulk loading platform which features two channels to directly load bulk trucks efficiently.
4. Does the system support continuous operation during truck changes?
Yes, the platform is equipped with dual loading channels and an automatic switch function that activates when one channel is full.
5. What services are included in the project scope?
The project covers the full lifecycle, including design, manufacturing, transportation, installation, commissioning, and performance testing.
6. Where is this specific project located?
This vehicle-mounted spiral unloader project is located at the Guangdong Zhuhai Gaolan Port.
01
Intelligence
02
High Efficiency
03
Revolution
04
Environmental









