Project Introduction
This project involves the installation of one set of a 300 tph fixed screw ship unloader. The system unloads materials from bulk carriers using a screw-type unloader, and then connects via an airslide conveyor to the rear material receiving system. The scope of work covers all activities throughout the entire process, including design, manufacturing, supply, transportation, installation, commissioning, and performance testing.
Equipment Introduction
The basic process flow of the fixed screw ship unloader is as follows (but not limited to this): After the bulk carrier docks at the wharf, the fixed screw ship unloader enters the operational area. The unloader then begins operating from the ship's hold and conveys the material via an airslide to the rear receiving system.
Frequently Asked Questions
Q:What is the capacity of the fixed screw ship unloader in this project?
The project features a fixed screw ship unloader with a design capacity of 300 tonnes per hour (tph).
Q:How does the unloader convey materials to the rear receiving system?
After extracting material from the bulk carrier's hold, the system connects and transfers the materials via an airslide conveyor directly to the rear receiving system.
Q:What is the full scope of work covered under this project?
The scope of work covers all stages of the process, including design, manufacturing, supply, transportation, installation, commissioning, and final performance testing of the system.
Q:What is the basic process flow of the equipment once a ship docks?
Once the bulk carrier docks, the fixed screw ship unloader moves into the operational area, begins extracting material from the hold, and conveys it via the airslide system.
Q:Where is this fixed screw ship unloader project located?
This project is installed and operated for the Tianjin Port Shenglong Investment Development project.