Track-mounted Continuous Environmental-friendly Spiral Ship Unloader for Cement - Top China Suppliers and Factory
Project Key Features
01
Two 450TPH track-mobile continuous environmental-friendly spiral bulk unloading machines are operating simultaneously to unload at the shore-side belt conveyor at the dock.
02
Each spiral unloading machine is equipped with a dust suppression system to ensure that the dust emissions during the unloading process meet environmental protection requirements.
03
The mobile gantry crane adopts a truss beam structure, with a light overall weight, reducing the load requirements on the dock.
04
The shore-side belt conveyor has successfully achieved the application of high belt speed in the powder material transportation industry, reducing the overall investment cost for customers.
05
The cable reel adopts a concealed cable groove structure, effectively avoiding the risk of traditional cables being exposed and damaging the dock.
06
The entire project (including unloader, conveyors, and control systems) was delivered within approximately 50 days from contract to commissioning.
Frequently Asked Questions
What is the unloading capacity of the ATXL800B ship unloader?
The system utilizes two track-mobile continuous spiral unloading machines, each providing a capacity of 450TPH, operating simultaneously for maximum efficiency.
How does the project address environmental concerns?
Each spiral unloading machine is integrated with a dedicated dust suppression system, ensuring all emissions meet strict environmental protection standards during operation.
What are the structural benefits of the mobile gantry crane?
It features a truss beam structure which significantly reduces the overall weight of the equipment, thereby lowering the structural load requirements on the dock infrastructure.
How is the power cable protected on the dock?
The equipment uses a concealed cable groove structure for the cable reel, which prevents exposure and eliminates the risk of accidental damage to the cables or the dock.
What was the lead time for this project?
The entire project—including design, production, installation, and commissioning of two unloaders and the full conveyor system—was completed in an efficient timeframe of about 50 days.